The Pulverised Coal Injection Plant was added to the Cockerill-Sambre steel works in Charleroi in the early 1990s. The site became Carsid and was closed in 2008.
The Pulverised Coal Injection Plant was added to the Cockerill-Sambre steel works in Charleroi in the early 1990s. The site became Carsid and was closed in 2008.
The Duferco steel works at Usine Gustave Boël made long steel products until production ceased in 2013. The NLMK areas of the plant are still in use.